Prepared for front stabilizer
Ready to mount solution
With this solution, both the hydraulic and the electric connections to a front stabilizer are built into the crane base and ready to work. This way, the body builder saves time during the crane installation.
Complete kit
When you choose this option, your crane will be delivered with the following parts:
- Two distribution valves for oil supply for front stabilizer leg.
- Two pressure transducers for mounting on the load holding valve of the front stabilizer leg, incl. 2 x 5 m. cable.
Commerciële documenten
Klik om documenten te openen en downloaden. Login om alle documenten te zien.